register number U.0.19 Facade formwork
data processing short term FASSADENSCHALUNG
standard
equipment
In the following positions, the MOV is not only determined by the unit, but also by weight or by area as a piece-by-piece listing does not make sense due to the multitude of elements.
This method permits fixing the MOV for each part, as the weight and the area of each individual part are indicated in the manufacturers' lists of articles.
In the case of formwork elements supplied with shuttering skin, the latter is written off together with the frame.
The maintenance costs and the costs for replacement of the shuttering skin - except for damage caused by violence - are included in the repair rates.
Formwork for mixed-construction facades as, for instance, prefab components and in-situ concrete.

Special parts for facade formwork: classification acc. to original value.
classification classification due to replacement value
register of construction equipment 1991