register number W.5.22 Workshop crane, mobile, (monorail trolley)
data processing short term KRAN WERKST FAHRB EK
standard
equipment
Monorail trolley crane. Operation at crane speeds of up to 63 m/min via floor controls. Bridge construction as box girder.
With electrical crane travel drive and crane-mobile floor controls.
Without trolley, lifting gear, crane rail, crane contact line
register of construction equipment 1991 2165
wearing part automatic rope unwinder slide blocks