register number W.5.23 Workshop crane, mobile, (double-rail trolley)
data processing short term KRAN WERKST FAHRB ZK
standard
equipment
Double-rail trolley crane. Operation at crane speeds of up to 63 m/min via floor controls. Bridge construction as box girder.
With electrical crane travel drive and crane-mobile floor controls.
Without trolley, lifting gear, crane rail, crane contact line.
register of construction equipment 1991 2166
wearing part automatic rope unwinder slide blocks
characteristic lifting capacity (t)

years of usage *
months of rate action *
monthly ratio for depreciation and interest rate *
monthly ratio for costs of repair *


accessory   number lifting capacity
in t
span
in m
rating of travel motors
in kW
weight
kg
average replacement value
Euro
monthly
costs of repair
in Euro
monthly depreciation
and interest rate
from Euro
monthly depreciation
and interest rate
to Euro
register of construction equipment 1991  
W.5.23.0032 3,2 12 0,36 2700 * * * * 2166
W.5.23.0063 6,3 16 0,50 4100 * * * * 2166
W.5.23.0080 8,0 22 0,50 5000 * * * * 2166
W.5.23.0100 10,0 16 0,50 5500 * * * * 2166
W.5.23.0200 20,0 16 0,85 7200 * * * * 2166

additional equipment = additional equipment, additional devices = additional devices