register number |
W.5.22 Workshop crane, mobile, (monorail trolley) |
data processing short term |
KRAN WERKST FAHRB EK |
standard equipment |
Monorail trolley crane. Operation at crane speeds of up to 63 m/min via floor controls. Bridge construction as box girder.
With electrical crane travel drive and crane-mobile floor controls.
Without trolley, lifting gear, crane rail, crane contact line
|
register of construction equipment 1991 |
2165 |
wearing part |
automatic rope unwinder slide blocks
|
characteristic |
lifting capacity (t) |
|
years of usage |
* |
months of rate action |
* |
monthly ratio for depreciation and interest rate |
* |
monthly ratio for costs of repair |
* |
|