register number |
U.2.03 Mobile steel scaffold |
data processing short term |
FAHRGERUEST ST |
standard equipment |
Note:
In the following positions, the median original value is not only determined on a piece-by-piece, but also on a weight- and area-related basis, as the piece-by-piece evaluation does not make sense due to the large number of pieces.
This method allows the determination of the median original value for each part, as the commodity catalogues of the manufacturers specifiy the weight and area of each individual part. Independent of the method chosen for the MOV evaluation, a piece-by-piece management based on the catalogues is still possible. Steel pipe system parts including travel beam, scaffolding width 0.70 and 1.00 m
Values: without ballast.
The following parts are necessary for the use as mobile scaffolding with the frame scaffoldings U.2.10.
Group 0: 0001 - 0008.
Group 1: 1001 - 1999 mobile steel scaffolding.
Group 2: 2001 - 2999 connecting parts for mobile steel scaffolding.
Note :
Couplings for pipe connections - see U.2.01.
Accessible floors for mobile steel scaffolding - see U.2.04.
|
register of construction equipment 1991 |
9612 |
characteristic |
weight (kg) |
|
years of usage |
* |
months of rate action |
* |
monthly ratio for depreciation and interest rate |
* |
monthly ratio for costs of repair |
* |
|